Nurul Malahayati, ST., M.Sc

Tentang Saya (About Me)

Appointed as full time lecturer at Faculty of Engineering, Department of Civil Engineering, Syiah Kuala University in the year 1998, and automatically become a public servant under the Government of Indonesia.



From 1988-1995, studied at Syiah Kuala University, Faculty of Engineering, Department of Civil Engineering, and graduated  with a degree Bachelor of Engineering. From 1999 - 2003, I advanced my professional education in Malaysia, at National University of Malaysia, Faculty of Engineerng, Department of Transportation and Civil Engineering and graduated with the degree Master of Science in Engineering.



I concentrated my self as an academicision by teaching, doing reseach and providing public service to the communities especialy in the field of Management Construction Engineering.



My careers:



1998-1999  Secretary to the field of Construction Management Engineering



2012-2016  Secretary to Department of Civil Engineering, Faculty of Engineering, Syiah Kuala                     University 



Curently I am a Phd student at Faculty of Engineering University of Syiah Kuala.



 

 




email malahayatijj[at]unsyiah.ac.id
www http://www.rp2u.unsyiah.ac.id
idGaruda idThomson idScopus idGoogleScholar

Publikasi (Publications)

Jurnal (Journals)

Nurul Malahayati, Munirwansyah, Mochammad Afifuddin dan Syamsidik, 2019, Factors Affecting Post-Disaster Housing Reconstruction on Preconstruction Stage in Pidie Jaya Regency Indonesia, IOP Conf. Series: Earth and Environmental Science, 273, 9, 1755-1315.

Nurul Malahayati, Yulia Hayati, Cut Nursaniah, Teuku Firsa, 2019, Study of Interlocking Brick Costing Based on The Result of Mixed Material Variation Design, IOP Conf. Series: Materials Science and Engineering, 536, 9, 1757-899X.

Nurul Malahayati, Yulia Hayati, Cut Nursaniah, T Firsa, Fachrurrazi, Aris Munandar, 2018, Comparative Study on the Cost of Building Public House Construction Using Red Brick and Interlock Brick Building Material in the City of Banda Aceh, IOP Conference Series: Materials Science and Engineering, 352, 012041, .

Fachrurrazi, Saiful Husin, Nurul Malahayati and Irzaidi, 2018, Identifying inaccuracy of MS Project using system analysis, IOP Conference Series: Materials Science and Engineering, 352, 012036, .

Nurisra, Nurul Malahayati, and Mahmuddin, 2018, The main factor affecting the competitiveness of Contractor Company, IOP Conference Series: Materials Science and Engineering, 352, 012034, .

Saiful Husin, Nurul Malahayati, Aldalina Anggraini, 2013, Kajian Resiko Pada Tahap Pra Bencana Untuk Penentuan Prioritas Proyek Konstruksi, Jurnal Teknik Sipil Universitas Syiah Kuala, Volume, 33 - 44, 2088-9321.

Ibnu Abas Majid, Nurul Malahayati, 2013, Kajian Akibat Variation Order Pada Tahap Pelaksanaan Proyek Konstruksi Di Provinsi Aceh, Jurnal Teknik Sipil Universitas Syiah Kuala, Nomor , 147 - 154, 2088 - 9321.

Nurul Malahayati, 2013, Durasi Proyek Dan Upah Tenaga Kerja Berdasarkan Pengalaman Kepala Tukang Pada Konstruksi Rumah di Kota Banda Aceh, Jurnal Teknik Sipil Universitas Syiah Kuala, Nomor , 173 - 180, 2088 - 9321.

Hendra Satria, Moch Afifuddin, Nurul Malahayati, 2012, Pengaruh Faktor Eksternal, Peralatan, Tenaga Kerja Dan Pelaksanaan Pekerjaan Terhadap Kinerja Biaya Proyek Konstruksi Bendungan (Studi Kasus Pada Provinsi Aceh), JurnalTeknik sipil Pascasarjana Universitas Syiah Kuala, No. 1,, 74 - 84, 2302 - 0253.

Rusman, Mutaqin, Nurul Malahayati, 2012, Faktor-Faktor Resiko Yang Mempengaruhi Kinerja Waktu Pelaksanaan Konstruksi Gedung Secara Swakelola (Studi Kasus: Proyek Pengembangan Sekolah Menengah Kejuruan Provinsi Aceh), JurnalTeknik sipil Pascasarjana Universitas Syiah Kuala, No. 1,, 97 - 111, 2302 - 0253.

Isnaini Aliyansyah, Azmeri, Nurul Malahayati, 2012, Identifikasi Faktor-Faktor Yang Dipertimbangkan Dalam Usulan Proyek Irigasi (Studi Kasus Pada Balai Wilayah Sungai Sumatera - I - Aceh), JurnalTeknik sipil Pascasarjana Universitas Syiah Kuala, No 2, , 44 - 56, 2302 - 0253.

Nurisra, Mubarak, dan Nurul Malahayati, 2009, Faktor-Faktor Penyebab Pengajuan Klaim Pada Proyek Konstruksi Di Banda Aceh, Jurnal Teknik Sipil Universitas Syiah Kuala, 7, 93-99, 1412-548X.

Cut Mutiawati, Nurul Malahayayi, dan Nadia Meisyara, 2009, Pengelolaan Mutu Pada Pelaksanaan Proyek Konstruksi Di Kota Banda Aceh dan Aceh Besar, Jurnal Teknik Sipil Universitas Syiah Kuala, Volume, 75-86, 1412-548X.

Mubarak dan Nurul Malahayati, 2007, Kajian Produktivitas Pemasangan Dinding Batafoam (Studi Kasus Pebangunan Aceh School Project Banda Aceh), Jurnal Teknik Sipil Universitas Syiah Kuala, 6, 69-78, 1412-548X.

Prosiding (Proceedings)

Nurul Malahayati., ST., M.Sc., Prof. Dr. Ir. Munirwansyah.,M.Sc., Dr. Ir. Mochammad Afifuddin., M.Eng., Dr. Syamsidik., ST., M.Sc, 2020, Faktor-faktor yang mempengaruhi waktu pelaksanaan rekonstruksi rumah pascabencana gempa bumi, KONTEKS 13\"Inovasi sains dan teknologi dalam penerapan infrastruktur berbasis mitigasi bencana dan berwawasan lingkungan\", Konferensi Nasional Teknik Sipil (KoNTekS)-13, Banda Aceh, 19-21 September 2019, Banda Aceh, Jurusan Teknik Sipil Fakultas Teknik Unsyiah, 0, 978-979-98659-6-0.

Nurul Malahayati., ST., M.Sc, Dr. Yulia Hayati., ST., M.Eng, Mahlil., ST., MT, Devi Sundari., ST., MT, Febriyanti Maulina., ST., MT, 2020, The Effect of Water Cement Ratio (WCR) on Sompressive Strength of Interlocking Bricks with Mix Design Variations, The 2nd Aceh International Symposium on Civil Engineering (AISCE), The 2nd Aceh International Symposium on Civil Engineering (AISCE), Banda Aceh, Indonesia, 18-19 September 2019, Banda Aceh, IOP Scopus, 0, IOP Conf. Series: Materials Science and.

Nurul Malahayati , Saiful Husin , Fachrurrazi , dan Febriyanti Maulina, 2017, Rasio Kebutuhan Tulangan Pondasi Beton Bertulang Pada Konstruksi Gedung di Provinsi Aceh, Meningkatkan Daya Saing Industri Konstruksi Dalam Persaingan Di Tingkat Global Menuju Pembangunan Infrastruktur Berkelanjutan, Konferensi Nasional Teknik Sipil 11 (Konteks 11), Universitas Tarumanagara Jakarta, 26-27 Oktober 2017, Jakarta, , 0, 978-602-60662-2-0.

Nurisra, Mahmuddin, Nurul Malahayati dan Intan Sari, 2016, Resiko Proyek Konstruksi Yang Bersumber Dari Faktor Kontrak dan Perencanaan Di Provinsi Aceh, Menuju Masyarakat Industri Konstruksi Berdaya Saing Tinggi dan Pembangunan Infrastruktur Berkelanjutan, Konferensi Nasional Teknik Sipil 10 (Konteks 10), Universitas Atma Jaya Yogyakarta, 26-27 Oktober 2016, Yogyakarta, Program Studi Teknik Sipil Fakultas Teknik Universitas Atma Jaya Yogyakarta, , 978-602-60286-0-0.

Nurul Malahayati, 2011, Prediksi Waktu Terhadap Biaya dan Luas Bangunan Pda Proyek Konstruksi Gedung Pendidikan di Provinsi Aceh, Seminar Nasional Ke-3 FT.UISU, Peranan Teknologi Dalam Peningkatan Kualitas Masyarakat, Sumatera Utara, 26-29 April 2011, Sumatera Utara, FT. UISU, 138-144, 978-602-96853-1-2.

Tripoli dan Nurul Malahayati, 2011, Tingkat Kerusakan Pada Gedung Sekolah Akibat Umur Bangunan, Prosiding Asesi Pembangunan Infrastruktur Aceh 2011, Pembangunan Infrastruktur Berkelanjutan & Berbasis Partisipatif, Banda Aceh, 26 Mei 2011, Banda Aceh, Fakultas Teknik Universitas Syiah Kuala, 135-144, 2086-5244.

Nurul Malahayati dan Elysa Wulandari, 2011, Gender Sensitivity Level On The Design Of Ablution Facilities On The Mosque In Banda Aceh, International Conference On Aceh And Indian Ocean Studies III, New Beginning Transformation In Post-Disaster And Post-Conflict Regions, Banda Aceh, 25-26 May 2011, Banda Aceh, The Globe Journal, 60, 0.

Nurul Malahayati, 2011, Managing Sanitation System In The Coastal Residential Of Lampulo Village In The City Of Banda Aceh, The 1st International Conference On Rebulding Place, From Culture To Art And Architecture, Banda Aceh, 4 Oktober 2011, Banda Aceh, Laboratory Of Design And Model Structure Architecture Departement Of Engineering Faculty Syiah Kuala University, 89-98, 978-979-19300-1-7.

Nurul Malahayati, 2011, Managing Sanitation System In The Coastal Residential Of Lampulo Village In The City Of Banda Aceh, The 1st International Conference On Rebulding Place, From Culture To Art And Architecture, Banda Aceh, 4 Oktober 2011, Banda Aceh, Laboratory Of Design And Model Structure Architecture Departement Of Engineering Faculty Syiah Kuala University, 89-98, 978-979-19300-1-7.

Nurul Malahayati, Saiful Husen, dan Ayifa Mursalin, 2010, Kajian Sistem Kontrak Konvensional dan Sistem Performance Based Contract (PBC) Pada Proyek Pemeliharaan Jalan, Proceeding Seminar Ilmiah Teknik sipil Ke-1, Peran SertaTeknik Sipil Dalam Pembangunan Aceh, Banda Aceh, 20 Pebruari 2010, Banda Aceh, Fakultas Teknik Universitas Syiah Kuala, 116-126, 2086-544.

Said Amir Azan dan Nurul Malahayati, 2010, Sistem Pemantauan Lalulintas Secara Automatik dan Real Time, Procceding Seminar Ilmiah Tknik Sipil Ke-1, Peran SertaTeknik Sipil Dalam Pembangunan Aceh, Banda Aceh, 20 Pebruari 2010, Banda Aceh, Fakultas Teknik Universitas Syiah Kuala, 127-134, 2086-5244.

Nurul Malahayati, Mubarak, dan Idris Ibrahim, 2008, Analisa Produktivitas Pemasangan Dinding Glass Reinforcement Concrete (GRC) (Studi Kasus Pembangunan Perumahan Cinta Kasih Banda Aceh), Seminar Sehari Ke-Tekniksipil-An, Profesional Sarjana Teknik Sipil Pada Dunia Konstruksi Di NAD, Banda Aceh, 20 Desember 2008, Banda Aceh, Fakultas Teknik Universitas Syiah Kuala, 117-126, 2085-0077.


Buku (Books)

Nurul Malahayati., ST., M.Sc dan Dr. Yulia Hayati., ST., M.Eng, 2019, Desain Rumah Menggunakan Material Bata Interlock, Unsyiah Press, UNSYIAH PRESS, 978-623-7086-48-2.

Training/Diklat (Workshops)

06-10-2015, workshop Aplikasi Faculty and Staff Dashboard (FSD) Untuk Dosen dan Karyawan Universitas Syiah Kuala, UPT Pusat Komputer dan Sistem Informasi Unsyiah, UPT Pusat Komputer dan Sistem Informasi Unsyiah