Dr. Mubarak, S.T., M.T.

Tentang Saya (About Me)

I am currently assigned as a lecturer and researcher on construction project management studies at the Civil Engineering Department of Universitas Syiah Kuala in Banda Aceh. I completed the bachelor's degree in Civil Engineering at Syiah Kuala University (1999), the master of engineering degree in Construction Project Management at Sepuluh Nopember Institute of Technology in Surabaya (2002), and the doctor of engineering degree in Civil Engineering at Syiah Kuala University (2020). I have been involved in lectures and researches related to project management, cost management, engineering economy, project scheduling, construction cost modeling, and operation research.

email mubarak[at]unsyiah.ac.id
www http://www.ft.unsyiah.ac.id/
idGaruda idThomson idScopus idGoogleScholar

Publikasi (Publications)

Jurnal (Journals)

Mubarak, Abdullah, M.Riza, Y. Hayati, 2019, ANALISIS PERUBAHAN KUANTITAS MATERIAL KOLOM BETON BERTULANG PADA MODEL STRUKTUR BANGUNAN GEDUNG SEDERHANA, REKAYASA SIPIL, 13(1), 1-8, 1978 - 5658.

Saiful Husin, Fachrurrazi Fachrurrazi, Maimun Rizalihadi, Mubarak Mubarak, 2019, Implementing Fuzzy TOPSIS on Project Risk Variable Ranking, Advances in Civil Engineering, 2019(1, 9283409: 1-10, 1687-8086 (Print); 1687-8094 (Online.

Saiful Husin, Mubarak Mubarak, Fachrurrazi Fachrurrazi, 2019, The Significance Risk for Factors of Labour, Material, and Equipment on Construction Project Quality, Aceh International Journal of Science and Technology, 8(2), 106-113, 2088-9860 (Print); 2503-2348 (Electronic).

Mubarak; Abdullah; Azmeri; Yulia Hayati, 2019, Cost Estimation of Structural Components of a Building by considering the Seismic Load on Different Regions, Advances in Civil Engineering, 2019, Article ID 7357913, 16878086 (Online); 16878094 (Print).

Mubarak, Tripoli, Nurisra, 2018, The Unit Price Implication of Reinforcement Usage in Tie Beam Reinforced Concrete Construction , Aceh International Journal of Science and Technology , 5(1), 24-31, p-2088-9860; e-2503-2348 .

Fachrurrazi, Saiful Husin, Tripoli, Mubarak, 2017, Neural network for the standard unit price of the building area, Procedia Engineering, 171, 282 – 293, 1877-7058.

Nurisra, Nurul Malahayati, Mahmuddin, Mubarak, 2014, ESTIMASI KETERSEDIAAN HARI KERJA UNTUK PENJADWALAN PROYEK KONSTRUKSI, Jurnal Teknik Sipil Universitas Syiah Kuala, Vol. 3, 113-120, 2088-9321.

Mubarak, Alfa Taras Bulba, Mega Yunita, 2014, STUDI NILAI PRODUKTIVITAS PEKERJAAN PONDASI BORED PILE, Jurnal Teknik Sipil Universitas Syiah Kuala, Vol. 3, 199-208, 2088-9321.

Tripoli, Mubarak, Yunia Shofiasti, 2013, FAKTOR-FAKTOR PENENTU PEMENANG PELELANGAN JASA PELAKSANA KONSTRUKSI, Jurnal Teknik Sipil Universitas Syiah Kuala, Vol. 2, 299-308, 2088-9321.

Mubarak, M. Isya, Pinta Sari, 2013, KAJIAN PENYEBAB DAN DAMPAK COST OVERRUN PADA PROYEK JALAN DAN JEMBATAN DI PROVINSI ACEH, Jurnal Teknik Sipil Universitas Syiah Kuala, Vol. 2, 155-164, 2088-9321.

Sejahtera, M. Isya, Mubarak, 2012, KLASIFIKASI DAN PERINGKAT DARI PENYEBAB KETERLAMBATAN WAKTU PELAKSANAAN PROYEK PADA BIDANG IRIGASI, RAWA DAN PANTAI DINAS PENGAIRAN ACEH, Jurnal Teknik Sipil Pascasarjana Universitas Syiah Kuala, Volume, 1- 11, 2302-0253 .

Muttaqin, Mubarak, Teuku Hamdani, 2012, PEMAHAMAN DAN PENERAPAN TATA KELOLA PROYEK OLEH PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) (STUDI KASUS PADA BIDANG IRIGASI, RAWA, DAN PANTAI DINAS PENGAIRAN ACEH), Jurnal Teknik Sipil Pascasarjana Universitas Syiah Kuala, Volume, 12- 23, 2302-0253.

Prosiding (Proceedings)

Mubarak, Abdullah, M Riza, Y Hayati, 2019, Changes in the unit price of work for reinforced concrete construction based on building sites, Connecting the World through Innovation and Sustainable Development, The 8th Annual International Conference (AIC) 2018 on Science and Engineering, Banda Aceh, Indonesia, September 12-14, 2018, IOP Conference Series: Materials Science and Engineering, IOP Publishing, 0, 1757-899X (Online); 1757-8981 (Print).

Tripoli, Mubarak, Nurisra, Mahmuddin, 2018, The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam, , The 7th AIC-ICMR on Science and Engineering 2017, Banda Aceh, Indonesia, October 18-20, 2017, IOP Conference Series: Materials Science and Engineering (MSE), IOP Publishing Ltd, , 2089-208X.

Mubarak, Abdullah, M Riza, Y Hayati, 2018, PERUBAHAN PENGGUNAAN MATERIAL PLAT LANTAI BETON BERTULANG DISEBABKAN PERBEDAAN ZONASI GEMPA, Penerapan Teknologi Prioritas dalam Rangka Mewujudkan Infrastruktur Indonesia yang Berkualitas, Konferensi Nasional Teknik Sipil 12, Batam, 18-19 September 2018, Yogyakarta, UNIVERSITAS ATMA JAYA YOGYAKARTA, 0, 978-602-60286-1-7.

Mubarak, Abdullah, M.Riza, Y. Hayati, 2018, Changes in the unit price of work for reinforced concrete construction based on building sites, Connecting The World Through Innovation and Sustainable Development, THE 8th AIC 2018 ON SCIENCES & ENGINEERING, Banda Aceh, Indonesia, September 12-14, 2018, Banda Aceh, Indonesia, University of Syiah Kuala, 0, -.

Mubarak, Saiful Husin, Mutia Oktaviati, 2017, External risk factors affecting construction costs, AIP Conference Proceedings 1903, PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD) 2017, Palembang, Indonesia, 14–17 August 2017, AIP Conference Proceedings, American Institute of Physics, 0, 978-0-7354-1591-1.

Tripoli, Nurisra, Mubarak, 2017, ANALISIS KEBUTUHAN TULANGAN PELAT LANTAI BETON BERTULANG PADA KONSTRUKSI BANGUNAN GEDUNG, Meningkatkan Daya Saing Industri Konstruksi Dalam Persaingan di Tingkat Global Menuju Pembangunan Infrastruktur Berkelanjutan, Konferensi Nasional Teknik Sipil 11, Jakarta, 26-27 Oktober 2017, Jakarta, Universitas Tarumanagara, 0, 978-602-60662-2-0.

Mubarak, Saiful Husin, Syarafina, 2016, RISIKO EKSTERNAL PADA PELAKSANA PROYEK KONSTRUKSI DI PROVINSI ACEH, Menuju Masyarakat Industri Konstruksi Berdaya Saing Tinggi dan Pembangunan Infrastruktur Berkelanjutan, Konferensi Nasional Teknik Sipil 10, Yogyakarta, 26-27 Oktober 2016, Yogyakarta, Program Studi Teknik Sipil Fakultas Teknik Universitas Atma Jaya Yogyakarta, 0, 978-602-60286-0-0.

Mubarak, Fachrurrazi, Nurul Malahayati, Muhammad Gazi Ansari, 2015, KAJIAN PRODUKTIVITAS PADA PEKERJAAAN PENUTUP ATAP, Peran Inovasi Rekayasa Konstruksi dalam Pembangunan Aceh yang Berkelanjutan, Seminar Nasional – Jurusan Teknik Sipil Unsyiah, Banda Aceh, 4 Juni 2015, Banda Aceh, Jurusan Teknik Sipil Unsyiah, 0, 2086-5244.

Maimun Rizalihadi, Saiful Husin, Mubarak, Iwan Syahyadi, 2015, Project Irrigation Efficiency Assesment on Paddy Field of Pandrah Irrigation Project, Aceh, International Symposium on Civil and Environmental Engineering, The 14th International Conference on QiR (Quality in Research) 2015, Lombok, Mataram, 10-13 August 2015, Jakarta, Faculty of Engineering UI, , 1411-1284.

Mahmuddin, Mubarak, 2014, Housing Rehabilatation Budget Estimate Due To Earthquake Disaster By Using Multiple Linear Regression Models, 9th Annual International Workshop and Expo on Sumatra Tsunami Disaster and Recovery, AIWEST-DR 2014, Banda Aceh, 22-24 October 2014, Banda Aceh, Syiah Kuala University, , 2086-3195.

Tripoli, Mahmuddin, Mubarak, 2014, MODEL ESTIMASI ANGGARAN BIAYA REHABILITASI RUMAH TINGGAL AKIBAT BENCANA GEMPA BUMI, Peran Rekayasa Sipil dalam Pembangunan Infrastruktur Perkotaan Berkelanjutan Untuk Mendukung Percepatan dan Perluasan Pembangunan Ekonomi Indonesia, Konferensi Nasional Teknik Sipil 8, Bandung, 16-18 Oktober 2014, Bandung, Jurusan Teknik Sipil - Institut Teknologi Nasional Bandung, , 978-602-71432-1-0.

Nurisra, Mubarak, 2013, CAUSES OF OVERHEAD COSTS OVERRUN IN BUILDING PROJECT IN BANDA ACEH, Infrastructure Planning and Management for Sustainable Development, Aceh International Symposium on Civil Engineering, Banda Aceh, 19-20 September 2013, Banda Aceh, CIVIL ENGINEERING DEPARTMENT - SYIAH KUALA UNIVERSITY, 0, 2338-9087.

Sofyan M. Saleh, Mubarak, Astiah Amir, 2013, COST OPTIMIZATION OF ROAD CONSTRUCTION PROJECT USING VALUE ENGINEERING JOB PLAN (Case Study of Road Construction Project Package JNB1, District of West Aceh), Infrastructure Planning and Management for Sustainable Development, Aceh International Symposium on Civil Engineering, Banda Aceh, 19-20 September 2013, Banda Aceh, CIVIL ENGINEERING DEPARTMENT - SYIAH KUALA UNIVERSITY, 0, 2338-9087.

Nurisra, Mubarak, 2013, KRITERIA PENILAIAN KINERJA SUBKONTRAKTOR MENURUT PERSPEKTIF KONTRAKTOR, SETENGAH ABAD BAHU-MEMBAHU MEMBANGUN BANGSA, Seminar Jurusan Teknik Sipil - Menyongsong 50 Tahun Jurusan Teknik Sipil dan 50 Tahun Fakultas Teknik Unsyiah, Banda Aceh, 28 Pebruari 2013, Banda Aceh, Jurusan Teknik Sipil Unsyiah, 0, 2086-5244.

T. Budi Aulia, Mubarak, Rahmatul Irfan, 2012, Factors Causing Rework at Building Construction in the Department of Highways and Settlements of Aceh Province , The 2nd Annual International Conference, The 2nd Annual International Conference, Banda Aceh, 22 -24 November 2012, Banda Aceh, Syiah Kuala University Press, , 2089-208X.